SB 346 Net energy metering; solar interconnection, cost recovery.

Introduced by: Suhas Subramanyam | all patrons    ...    notes | add to my profiles

SUMMARY AS INTRODUCED:

Net energy metering; solar interconnection; cost recovery. Provides that an electric distribution company shall pay $1 per kilowatt per day for the costs of lost electricity production for any and all delays beyond the regulatory notice period required by State Corporation Commission related to net energy metering. The bill requires that, for the purposes of net energy metering, an eligible customer-generator shall bear all reasonable costs of equipment required at the eligible customer-generator's side of the meter for the interconnection to the supplier's electric distribution system, including reasonable and prudent costs of additional controls, tests, or liability insurance. Additionally, the bill allows for cost recovery by Phase I and Phase II Utilities for electric distribution grid transformation projects that support the interconnection of generating facilities using energy derived from sunlight that are owned or contracted by eligible customer-generators, subject to the Commission finding those costs to be reasonable and prudent in accordance with existing law.


FULL TEXT

AMENDMENTS

HISTORY