SEARCH SITE
VIRGINIA LAW PORTAL
- Code of Virginia
- Virginia Administrative Code
- Constitution of Virginia
- Charters
- Authorities
- Compacts
- Uncodified Acts
- RIS Users (account required)
SEARCHABLE DATABASES
- Bills & Resolutions
session legislation - Bill Summaries
session summaries - Reports to the General Assembly
House and Senate documents - Legislative Liaisons
State agency contacts
ACROSS SESSIONS
- Subject Index: Since 1995
- Bills & Resolutions: Since 1994
- Summaries: Since 1994
Developed and maintained by the Division of Legislative Automated Systems.
2011 SESSION
Be it enacted by the General Assembly of Virginia:
1. That §§ 2.2-225, 2.2-1509.3, 2.2-2006, 2.2-2007, 2.2-2008, 2.2-2012, 2.2-2015, 2.2-2017, 2.2-2020, 2.2-2021, and 58.1-1840.1 of the Code of Virginia are amended and reenacted and that the Code of Virginia is amended by adding a section numbered 2.2-2018.1 as follows:
§ 2.2-225. Position established; agencies for which responsible; additional powers.
The position of Secretary of Technology (the Secretary) is created. The Secretary shall be responsible to the Governor for the following agencies, councils, and boards: Information Technology Advisory Council, Innovation and Entrepreneurship Investment Authority, Virginia Information Technologies Agency, Virginia Geographic Information Network Advisory Board, and the Wireless E-911 Services Board. The Governor, by executive order, may assign any other state executive agency to the Secretary, or reassign any agency listed in this section to another Secretary.
Unless the Governor expressly reserves such power to himself, the Secretary may, with regard to strategy development, planning and budgeting for technology programs in the Commonwealth:
1. Monitor trends and advances in fundamental technologies of interest and importance to the economy of the Commonwealth and direct and approve a stakeholder-driven technology strategy development process that results in a comprehensive and coordinated view of research and development goals for industry, academia and government in the Commonwealth. This strategy shall be updated biennially and submitted to the Governor, the Speaker of the House of Delegates and the President Pro Tempore of the Senate.
2. Work closely with the appropriate federal research and development agencies and program managers to maximize the participation of Commonwealth industries and universities in these programs consistent with agreed strategy goals.
3. Direct the development of plans and programs for strengthening the technology resources of the Commonwealth's high technology industry sectors and for assisting in the strengthening and development of the Commonwealth's Regional Technology Councils.
4. Direct the development of plans and programs for improving access to capital for technology-based entrepreneurs.
5. Assist the Joint Commission on Technology and Science created pursuant to § 30-85 in its efforts to stimulate, encourage, and promote the development of technology in the Commonwealth.
6. Continuously monitor and analyze the technology investments and strategic initiatives of other states to ensure the Commonwealth remains competitive.
7. Strengthen interstate and international partnerships and relationships in the public and private sectors to bolster the Commonwealth's reputation as a global technology center.
8. Develop and implement strategies to accelerate and expand the commercialization of intellectual property created within the Commonwealth.
9. Ensure the Commonwealth remains competitive in cultivating and expanding growth industries, including life sciences, advanced materials and nanotechnology, biotechnology, and aerospace.
10. Monitor the trends in the availability and deployment of and access to broadband communications services, which include, but are not limited to, competitively priced, high-speed data services and Internet access services of general application, throughout the Commonwealth and advancements in communications technology for deployment potential. The Secretary shall report annually by December 1 to the Governor and General Assembly on those trends.
11. Review and approve the procurement or termination of
major information technology projects, and contracts or amendments thereto
proposed by the Chief Information Officer (CIO) pursuant to § 2.2-2007.
Review and approve or disapprove, according to the recommendations of the Chief
Information Officer (CIO) pursuant to § 2.2-2008, the selection or termination
of any Commonwealth information technology project that has been defined or
designated as a “major information technology project” pursuant to subdivision
13 and any Commonwealth information technology project with high risk and high
complexity.
12. Review and approve statewide technical and data standards for information technology and related systems, including the utilization of nationally recognized technical and data standards for health information technology systems or software purchased by a state agency of the Commonwealth, as recommended by the CIO pursuant to § 2.2-2007.
13. Develop criteria and requirements defining "major
information technology project" for purposes of § 2.2-2006. Such criteria
and requirements shall include, but are not limited to, analysis of each
project's risk and complexity. Develop the criteria, requirements, and
process for defining a Commonwealth information technology project as a “major
information technology project” for the purposes of § 2.2-2006, including the
criteria, requirements, and process for designating a Commonwealth information
technology project that has a cost below $1 million as a “major information
technology project.”
14. Designate Commonwealth information technology projects as major information technology projects according to the criteria, requirements, and process developed pursuant to subdivision 13.
15. Review and approve the initiation or termination of any procurement conducted pursuant to § 2.2-2012 with a total estimated cost over $1 million, and contracts or amendments thereto.
16. Review and approve statewide information technology project, procurement, and investment management policies and standards, as developed and recommended by the CIO pursuant to § 2.2-2007.
17. Designate specific projects as enterprise information technology projects, prioritize the implementation of enterprise information technology projects, establish enterprise oversight committees to provide ongoing oversight for enterprise information technology projects.
18. Review and approve the Commonwealth Project Management Standard as defined in § 2.2-2006.
19. Establish Internal Agency Oversight Committees and Secretariat Oversight Committees as necessary and in accordance with § 2.2-2021.
§ 2.2-1509.3. Budget bill to include appropriations for major information technology projects.
A. For purposes of this section, unless the context requires a different meaning:
"Commonwealth Project Management Standard" means the same as that term is defined in § 2.2-2006.
"Major information technology project" means the same as that term is defined in § 2.2-2006.
"Major information technology project funding" means an estimate of each funding source for a major information technology project for the duration of the project.
B. In "The Budget Bill" submitted pursuant to §
2.2-1509, the Governor shall provide for the funding of major information
technology projects, as specified herein. Such funding recommendations shall be
for major information technology projects that have or are pending project development
initiation approval as defined by § 2.2-2019 or procurement
approval as defined by § 2.2-2020 in the Commonwealth Project Management
Standard.
The Governor shall include in "The Budget Bill" submitted pursuant to § 2.2-1509 a biennial appropriation for major information technology projects and the following information for each such project:
1. A For major information technology projects that
have been recommended for funding, a brief statement explaining the
business case for the project, the CIO's ranking and recommendations on
the project as required by § 2.2-2008, the priority of the project in
the Recommended Technology Investment Projects Report as required by §
2.2-2007, and an explanation, if necessary, if the Governor informed the
Secretary of Technology that an emergency existed as set forth in § 2.2-2008,
and the anticipated duration of the project;
2. A brief explanation of the inclusion of any project in the budget bill that has not undergone review and approval by the Secretary of Technology as required by § 2.2-225;
3. Total estimated project costs, as defined by the Commonwealth's
Commonwealth Project Management Standards Standard,
including the amount of the agency's or institution's operating appropriation,
which will support the project, and long-term contract cost beyond the biennium
that will support the project;
4. Costs All project costs incurred to date,
as defined by the Commonwealth's Commonwealth Project Management
Standards, which includes both the project planning cost and internal operating
costs to support the project Standard;
5. Recommendations or comments of the Public-Private
Partnership Advisory Commission, if the project is part of a proposal under the
Public-Private Education Facilities and Infrastructure Act of 2002 (§ 56-575.1
et seq.); and
6. The CIO's assessment of the project and the status as of
the date of the budget bill submission to the General Assembly.;
7. The planned project start and end dates as defined by the Commonwealth Project Management Standard; and
8. Projected annual operations and maintenance expenditures, including but not limited to fees, licenses, infrastructure, and agency and nonagency staff support costs, for information technology delivered by major information technology projects for the first budget biennium after project completion.
C. The Secretary of Technology shall immediately notify each member of the Senate Finance Committee and the House Appropriations Committee of any decision to terminate in accordance with § 2.2-225 any major information technology project in the budget bill. Such communication shall include the Secretary of Technology's reason for such termination.
§ 2.2-2006. Definitions.
As used in this chapter, unless the context requires a different meaning:
"Commonwealth information technology project" means any state agency information technology project that is under Commonwealth governance and oversight.
"Commonwealth Project Management Standard" means a document developed and recommended by the Chief Information Officer (CIO) pursuant to § 2.2-2008, and approved by the Secretary pursuant to § 2.2-225, that describes the methodology for conducting information technology projects, and the governance and oversight used to ensure project success.
"Communications services" includes telecommunications services, automated data processing services, and management information systems that serve the needs of state agencies and institutions.
"Confidential data" means information made confidential by federal or state law that is maintained by a state agency in an electronic format.
"Enterprise" means an organization with common or unifying business interests. An enterprise may be defined at the Commonwealth level or secretariat level for program and project integration within the Commonwealth, secretariats, or multiple agencies.
"Information technology" means telecommunications, automated data processing, applications, databases, the Internet, management information systems, and related information, equipment, goods, and services. The provisions of this chapter shall not be construed to hamper the pursuit of the missions of the institutions in instruction and research.
"ITAC" means the Information Technology Advisory Council created in § 2.2-2699.5.
"Major information technology project" means any
state agency Commonwealth information technology project that (i)
meets the criteria and requirements developed by the Secretary of Technology
pursuant to § 2.2-225 or (ii) has a total estimated cost of more than $1
million or that has been designated a major information technology project
by the Secretary pursuant to § 2.2-225.
"Noncommercial telecommunications entity" means any public broadcasting station as defined in § 2.2-2427.
"Public telecommunications entity" means any public broadcasting station as defined in § 2.2-2427.
"Public telecommunications facilities" means all apparatus, equipment and material necessary for or associated in any way with public broadcasting stations or public broadcasting services as those terms are defined in § 2.2-2427, including the buildings and structures necessary to house such apparatus, equipment and material, and the necessary land for the purpose of providing public broadcasting services, but not telecommunications services.
"Public telecommunications services" means public broadcasting services as defined in § 2.2-2427.
"Secretary" means the Secretary of Technology.
"State agency" or "agency" means any agency, institution, board, bureau, commission, council, or instrumentality of state government in the executive branch listed in the appropriation act. However, the terms "state agency," "agency," "institution," "public body," and "public institution of higher education," shall not include the University of Virginia Medical Center.
"Technology asset" means hardware and communications equipment not classified as traditional mainframe-based items, including personal computers, mobile computers, and other devices capable of storing and manipulating electronic data.
"Telecommunications" means any origination, transmission, emission, or reception of signs, signals, writings, images, and sounds or intelligence of any nature, by wire, radio, television, optical, or other electromagnetic systems.
"Telecommunications facilities" means apparatus necessary or useful in the production, distribution, or interconnection of electronic communications for state agencies or institutions including the buildings and structures necessary to house such apparatus and the necessary land.
§ 2.2-2007. Powers of the CIO.
A. In addition to such other duties as the Secretary may assign, the CIO shall:
1. Monitor trends and advances in information technology;
develop a comprehensive, statewide, two-year six-year Commonwealth strategic
plan for information technology to include: (i) specific projects that
implement the plan; (ii) a plan for the acquisition, management, and use of
information technology by state agencies; and (iii) a report of the
progress of any ongoing enterprise application information technology
projects, any factors or risks that might affect their successful
completion, and any changes to their projected implementation costs and
schedules; and (iv) a report on the progress made by state agencies toward
accomplishing the Commonwealth strategic plan for information technology.
The statewide Commonwealth strategic plan for information
technology shall be updated annually and submitted to the Secretary for
approval.
2. Direct the formulation and promulgation of policies, guidelines, standards, and specifications for the purchase, development, and maintenance of information technology for state agencies, including, but not limited to, those (i) required to support state and local government exchange, acquisition, storage, use, sharing, and distribution of geographic or base map data and related technologies, (ii) concerned with the development of electronic transactions including the use of electronic signatures as provided in § 59.1-496, and (iii) necessary to support a unified approach to information technology across the totality of state government, thereby assuring that the citizens and businesses of the Commonwealth receive the greatest possible security, value, and convenience from investments made in technology.
3. Direct the development of policies and procedures, in consultation with the Department of Planning and Budget, that are integrated into the Commonwealth's strategic planning and performance budgeting processes, and that state agencies and public institutions of higher education shall follow in developing information technology plans and technology-related budget requests. Such policies and procedures shall require consideration of the contribution of current and proposed technology expenditures to the support of agency and institution priority functional activities, as well as current and future operating expenses, and shall be utilized by all state agencies and public institutions of higher education in preparing budget requests.
4. Review budget requests for information technology from state agencies and public institutions of higher education and recommend budget priorities to the Secretary.
Review of such budget requests shall include, but not be
limited to, all data processing or other related projects for amounts exceeding
$100,000 $250,000 in which the agency or institution has entered
into or plans to enter into a contract, agreement or other financing agreement
or such other arrangement that requires that the Commonwealth either pay for
the contract by foregoing revenue collections, or allows or assigns to another
party the collection on behalf of or for the Commonwealth any fees, charges, or
other assessments or revenues to pay for the project. For each project, the
agency or institution, with the exception of public institutions of higher education
that meet the conditions prescribed in subsection B of § 23-38.88, shall
provide the CIO (i) a summary of the terms, (ii) the anticipated duration, and
(iii) the cost or charges to any user, whether a state agency or institution or
other party not directly a party to the project arrangements. The description
shall also include any terms or conditions that bind the Commonwealth or
restrict the Commonwealth's operations and the methods of procurement employed
to reach such terms.
State agencies and institutions, with the exception of public institutions of higher education that meet the conditions prescribed in subsection B of § 23-38.88, shall submit to the CIO a projected biennial operations and maintenance budget for technology assets owned or licensed by the agency or institution, and submit a budget decision package for any shortfalls.
5. Direct the development of policies and procedures for the
effective management of information technology investments throughout their
entire life cycles, including, but not limited to, project definition,
identification, business case development, selection, procurement, development,
implementation, operation, performance evaluation, and enhancement or
retirement. Such policies and procedures shall include, at a minimum, the
periodic review by the CIO of agency and public institution of higher education
major Commonwealth information technology projects.
6. The CIO shall provide Provide technical
guidance to the Department of General Services in the development of policies
and procedures for the recycling and disposal of computers and other technology
assets. Such policies and procedures shall include the expunging, in a manner
as determined by the CIO, of all state confidential data and personal
identifying information of citizens of the Commonwealth prior to such sale,
disposal, or other transfer of computers or other technology assets.
6 7. Oversee and administer the Virginia
Technology Infrastructure Fund created pursuant to § 2.2-2023.
7 8. Periodically evaluate the feasibility of
outsourcing information technology resources and services, and outsource those
resources and services that are feasible and beneficial to the Commonwealth.
8 9. Have the authority to enter into contracts,
and with the approval of the Secretary of Technology for any contracts over $1
million, with one or more other public bodies, or public agencies or
institutions or localities of the several states, of the United States or its
territories, or the District of Columbia for the provision of information
technology services.
9 10. The CIO shall prepare an annual report for
submission to the Secretary, the Information Technology Advisory Council, and
the Joint Commission on Technology and Science on a prioritized list of
Recommended Technology Investment Projects (RTIP Report) based upon
major information technology projects submitted for business case approval
pursuant to this chapter. As part of this plan the RTIP Report,
the CIO shall develop and regularly update a methodology for prioritizing
projects based upon the allocation of points to defined criteria. The criteria
and their definitions shall be presented in the plan RTIP Report.
For each project listed recommended for funding in the plan
RTIP Report, the CIO shall indicate the number of points and how they were
awarded. For each listed project, the CIO shall also indicate report (i)
the projected cost of the project for the next three biennia following project
implementation all projected costs of ongoing operations and maintenance
activities of the project for the next three biennia following project
implementation; (ii) all projected costs of ongoing operations and
maintenance activities a justification and description for each project
baseline change; and (iii) whether the project fails to incorporate
existing standards for the maintenance, exchange, and security of data. This
report shall also include trends in current projected information technology
spending by state agencies and at the enterprise level secretariats,
including spending on projects, operations and maintenance, and payments to
VITA. Agencies shall provide all project and cost information required to
complete the RTIP Report to the CIO prior to May 31 immediately preceding any
budget biennium in which the project appears in the Governor’s budget bill.
10 11. Direct the development of policies and
procedures that require VITA the Division of Project Management
established pursuant to § 2.2-2016, on behalf of the CIO, to review
major and recommend Commonwealth information technology projects
proposed by state agencies and institutions and recommend to the Secretary
whether such projects be approved or disapproved. The CIO shall disapprove
major information technology projects that do not conform to the statewide
strategic information technology plan or to the individual plans of state
agencies or institutions of higher education. For projects that do not meet the
definition of major information technology project as defined in § 2.2-2006,
the CIO shall develop criteria and requirements defining whether such projects
are subject to the provisions of this subdivision. Such policies and
procedures shall be based on the criteria outlined within § 2.2-2017.
11 12. Oversee the Commonwealth's
Provide oversight for state agency or public institution of higher education
efforts to modernize the planning, development, implementation, improvement, operations
and maintenance, and retirement of Commonwealth applications
information technology, including oversight for the coordination
and selection, development and management of
enterprise-wide or multiagency applications enterprise information
technology. At the discretion of the Governor, the CIO shall designate a state
agency or public institution of higher education as the business sponsor
responsible for implementing an enterprise information technology project, and
define the responsibilities of lead agencies that implement enterprise
information technology projects.
12 13. Develop and recommend to the Secretary
statewide technical and data standards for information technology and related
systems, including the utilization of nationally recognized technical and data
standards for health information technology systems or software purchased by a
state agency of the Commonwealth.
14. Establish Internal Agency Oversight Committees and
Secretariat Oversight Committees as necessary and in accordance with §
2.2-2021.
B. Consistent with § 2.2-2012, the CIO may enter into public-private partnership contracts to finance or implement information technology programs and projects. The CIO may issue a request for information to seek out potential private partners interested in providing programs or projects pursuant to an agreement under this subsection. The compensation for such services shall be computed with reference to and paid from the increased revenue or cost savings attributable to the successful implementation of the program or project for the period specified in the contract. The CIO shall be responsible for reviewing and approving the programs and projects and the terms of contracts for same under this subsection. The CIO shall determine annually the total amount of increased revenue or cost savings attributable to the successful implementation of a program or project under this subsection and such amount shall be deposited in the Virginia Technology Infrastructure Fund created in § 2.2-2023. The CIO is authorized to use moneys deposited in the Fund to pay private partners pursuant to the terms of contracts under this subsection. All moneys in excess of that required to be paid to private partners, as determined by the CIO, shall be reported to the Comptroller and retained in the Fund. The CIO shall prepare an annual report to the Governor, the Secretary, and General Assembly on all contracts under this subsection, describing each information technology program or project, its progress, revenue impact, and such other information as may be relevant.
C. The CIO shall strive to follow acceptable technology
investment methods, such as Information Technology Investment Management (ITIM)
principles developed by the United States Government Accountability Office,
develop and recommend to the Secretary a technology investment management
standard based on acceptable technology investment methods to ensure that
all state agency or public institution of higher education technology
expenditures are an integral part of the Commonwealth's performance management
system, produce value for the agency and the Commonwealth, and are
aligned with (i) agency strategic business objectives plans, (ii)
the Governor's policy objectives, and (iii) the long-term objectives of the
Council on Virginia's Future.
D. Subject to review and approval by the Secretary, the CIO shall have the authority to enter into and amend contracts for the provision of information technology services.
§ 2.2-2008. Additional duties of the CIO relating to project management.
The CIO shall have the following duties relating to the management of information technology projects:
1. Develop an approval process for proposed major
and recommend to the Secretary a Commonwealth Project Management Standard for
information technology projects by state agencies to ensure or public
institutions of higher education that establishes a methodology for the initiation,
planning, execution, and closeout of information technology projects and
related procurements. Such methodology shall include the establishment of
appropriate oversight for information technology projects. The basis for the
governance and oversight of information technology projects shall include, but
not necessarily be limited to, an assessment of the project’s risk and
complexity. The Commonwealth Project Management Standard shall require that
all such projects conform to the statewide information management Commonwealth
strategic plan and the for information management technology
developed and approved pursuant to § 2.2-2007 and the strategic plans of
agencies and public institutions of higher education. All executive branch
agencies and public institutions of higher education shall conform to the
requirements of the Commonwealth Project Management Standard.
2. Establish a methodology for conceiving, planning,
scheduling and providing appropriate oversight for information technology
projects including a process for approving the planning, development and
procurement of information technology projects. Such methodology shall include
guidelines for the establishment of appropriate oversight for information
technology projects.
3 2. Establish minimum qualifications and
training standards for project managers.
4. Provide the Secretary with a recommendation and rank of
all procurement solicitations involving major information technology projects.
5. Direct the development of any statewide or multiagency
enterprise project.
6. Develop and update a project management methodology to
be used by agencies in the development of information technology.
7 3. Establish an information clearinghouse that
identifies best practices and new developments and contains detailed
information regarding the Commonwealth's previous experiences with the
development of major information technology projects.
8 4. Determine, prior to proceeding with the
development of a major information technology project pursuant to § 2.2-2019 or
the procurement of any major information technology project pursuant to §
2.2-2020, that the Disapprove any agency or public institution of higher
education request to initiate a major information technology project or related
procurement if funding for such project has not been included in the
budget bill in accordance with § 2.2-1509.3. The provisions of this subdivision
shall not apply upon a determination by the Governor that an emergency exists
and a major information technology project is necessary to address the
emergency.
5. Review and approve or disapprove the selection or termination of any Commonwealth information technology project that has not been defined or designated as a major information technology project pursuant to § 2.2-225 or that does not have high risk and high complexity. For any Commonwealth information technology projects defined or designated as major information technology projects, or that have high risk and high complexity, the CIO shall recommend approval or disapproval to the Secretary pursuant to § 2.2-225.
6. Disapprove or recommend for disapproval by the Secretary any Commonwealth information technology projects that do not conform to the Commonwealth strategic plan for information technology developed and approved pursuant to § 2.2-2007 or to the strategic plans of state agencies or public institutions of higher learning.
§ 2.2-2012. Procurement of information technology and telecommunications goods and services; computer equipment to be based on performance-based specifications.
A. Information technology and telecommunications goods and services of every description shall be procured by (i) VITA for its own benefit or on behalf of other state agencies and institutions or (ii) such other agencies or institutions to the extent authorized by VITA. Such procurements shall be made in accordance with the Virginia Public Procurement Act (§ 2.2-4300 et seq.), regulations that implement the electronic and information technology accessibility standards of the Rehabilitation Act of 1973 (29 U.S.C. § 794d), as amended, and any regulations as may be prescribed by VITA. In no case shall such procurements exceed the requirements of the regulations that implement the electronic and information technology accessibility standards of the Rehabilitation Act of 1973, as amended.
The CIO shall disapprove any procurement that does not conform
to the statewide Commonwealth strategic plan for information
technology plan developed and approved pursuant to § 2.2-2007 or
to the individual strategic plans of state agencies or public
institutions of higher education.
B. All statewide contracts and agreements made and entered into by VITA for the purchase of communications services, telecommunications facilities, and information technology goods and services shall provide for the inclusion of counties, cities, and towns in such contracts and agreements. Notwithstanding the provisions of § 2.2-4301, VITA may enter into multiple vendor contracts for the referenced services, facilities, and goods and services.
C. The Department VITA may establish contracts
for the purchase of personal computers and related devices by licensed teachers
employed in a full-time teaching capacity in Virginia public schools or in
state educational facilities for use outside the classroom. The computers and
related devices shall not be purchased with public funds, but shall be paid for
and owned by teachers individually provided that no more than one such computer
and related device per year shall be so purchased.
D. If VITA, or any agency or institution authorized by VITA, elects to procure personal computers and related peripheral equipment pursuant to any type of blanket purchasing arrangement under which public bodies, as defined in § 2.2-4301, may purchase such goods from any vendor following competitive procurement but without the conduct of an individual procurement by or for the using agency or institution, it shall establish performance-based specifications for the selection of equipment. Establishment of such contracts shall emphasize performance criteria including price, quality, and delivery without regard to "brand name." All vendors meeting the Commonwealth's performance requirements shall be afforded the opportunity to compete for such contracts.
E. This section shall not be construed or applied so as to infringe upon, in any manner, the responsibilities for accounting systems assigned to the Comptroller under § 2.2-803.
F. The CIO of VITA shall, on or before October 1, 2009,
and every two years thereafter, solicit from each state agency and public
institution of higher education a list of procurements that were competed with
the private sector that appear on the Commonwealth Competition Council's
commercial activities list and were, until that time, being performed by each
state agency and public institution of higher education during the previous two
years, and the outcome of that competition. The CIO shall make the lists
available to the public on VITA's website.
§ 2.2-2015. Authority of CIO to modify or suspend information technology projects; project termination.
The CIO may direct the modification or suspension of any major
Commonwealth information technology project that, as the result of a
periodic review authorized by subdivision A 5 of § 2.2-2007, has not met the
performance measures agreed to by the CIO and the sponsoring state agency
or public institution of higher education, or if he otherwise deems such
action appropriate and consistent with the terms of any affected contracts.
The CIO may recommend to the Secretary direct
the termination of such any Commonwealth information technology project
that has not been defined or designated a major information technology project,
or does not have high risk and high complexity and that, as the result of a periodic
review authorized by subdivision A 5 of § 2.2-2007, has not met the performance
measures agreed to by the CIO and the sponsoring state agency or public
institution of higher education, or if he otherwise deems such action
appropriate and consistent with the terms of any affected contracts.
The CIO may recommend to the Secretary pursuant to § 2.2-225 the termination of any major information technology project, or any information technology project with high risk and high complexity that, as the result of a periodic review authorized by subdivision A 5 of § 2.2-2007, has not met the performance measures agreed to by the CIO and the sponsoring state agency or public institution of higher education, or if he otherwise deems such action appropriate and consistent with the terms of any affected contracts.
Nothing in this section shall be construed to supersede the responsibility of a board of visitors for the management and operation of a public institution of higher education.
The provisions of this section shall not apply to research
projects, research initiatives or instructional programs at public institutions
of higher education. However, technology investments in research projects,
research initiatives or instructional programs at such institutions estimated
to cost $1 million or more of general fund appropriations may be reviewed as
provided in subdivision A 5 of § 2.2-2007 if the projects are deemed
mission-critical by the institution or of statewide application by the CIO.
The CIO and the Secretary of Education, in consultation with public
institutions of higher education, shall develop and provide to such institution
criteria to be used in determining whether projects are mission-critical.
§ 2.2-2017. Powers and duties of the Division.
The Division shall have the power and duty to:
1. Implement the approval process for information technology
projects developed in accordance with § 2.2-2008 the Commonwealth
Project Management Standard;
2. Assist the Secretary and the CIO in the development
and implementation of a project management methodology policies,
standards, guidelines and methodologies to be used in the development of
and implementation of information technology projects for information
technology projects in accordance with this article;
3. Provide ongoing assistance and support to state agencies and public institutions of higher education in the development of information technology projects;
4. Establish a program providing cost-effective training to agency project managers;
5. Review information management and information technology plans submitted by agencies and public institutions of higher education and recommend to the CIO the approval of such plans and any amendments thereto;
6. Monitor the implementation of information management and information technology plans and periodically report its findings to the CIO;
7. Assign project management specialists to review
Review and recommend information technology proposals projects based
on criteria developed by the Division based on pursuant to § 2.2-2007
that assess the (i) degree to which the project is consistent with the
Commonwealth's overall strategic plan; (ii) technical feasibility of the
project; (iii) benefits to the Commonwealth of the project, including customer
service improvements; (iv) risks associated with the project; (v) continued
funding requirements; and (vi) past performance by the agency on other
projects; and
8. Provide oversight for state agency information technology projects; and
9. Report on a quarterly basis to the CIO, the Secretary, the Governor, the Information Technology Advisory Council, the Joint Legislative Audit and Review Commission, the Auditor of Public Accounts, the House Appropriations Committee, the Senate Finance Committee, and the Joint Commission on Technology and Science the status and performance of each major information technology project and related procurement conducted by any state agency or institution.
§ 2.2-2018.1. Project and procurement investment business case approval.
A. In accordance with policies and standards approved by the Secretary pursuant to § 2.2-225, state agencies and public institutions of higher education shall obtain CIO approval prior to the initiation of any Commonwealth information technology project or procurement with a total estimated cost below $1 million, or Secretary approval for any Commonwealth information technology project or procurement with a total estimated cost of $1 million or more. When selecting an information technology investment, state agencies and public institutions of higher education shall submit to the Division an investment business case, outlining the business value of the investment, the proposed technology solution, if known, and an explanation of how the project will support the agency strategic plan, the agency’s secretariat's strategic plan, and the Commonwealth strategic plan for information technology developed and approved pursuant to § 2.2-2007. The Division may require the submission of additional information if needed to adequately review any such proposal.
B. The Division shall review each investment business case submitted in accordance with this section and recommend its approval or rejection to the CIO pursuant to the policies and procedures developed in § 2.2-2007.
C. In accordance with policies and standards outlined in the Commonwealth Project Management Standard, the CIO shall review the business case for any Commonwealth information technology project or procurement and approve or disapprove, or recommend approval or disapproval to the Secretary pursuant to § 2.2-225.
§ 2.2-2020. Procurement approval for information technology projects.
Upon approval of the CIO of the project development
proposal involving a major information technology project that requires the
procurement of goods or services, the The agency shall submit a copy
of any Invitation for Bid (IFB) or Request for Proposal (RFP) to the Division.
The project management specialist Division shall review the IFB
or RFP and recommend its approval or rejection to the Secretary CIO.
The agency shall submit a copy of any proposed contract or final contract to
the Division. The Division shall review the proposed contract or final contract
and recommend its approval or rejection to the CIO. A project shall be granted
project initiation approval as provided by the Commonwealth Project Management
Standard before the award of any contract. The Secretary, pursuant to §
2.2-225, shall have the final authority to approve the IFB or RFP prior to its
release and shall approve the proposed contract for the award of the project.
§ 2.2-2021. Project oversight committees.
A. Whenever an agency has received approval from the
Secretary to proceed with the development and acquisition of the project
charter has been approved for a major information technology project, an
enterprise information technology project, or for an information technology
project with high risk and high complexity, the Secretary shall establish an
internal agency oversight committee shall be established by the CIO Internal
Agency Oversight Committee (IAOC). Whenever the project charter has been
approved for any other Commonwealth information technology project, the CIO
shall establish an IAOC. The internal agency oversight committee shall
provide ongoing oversight for IAOC shall represent all business or
functional stakeholders of the project and including stakeholders
in other agencies, assure that all stakeholders have the opportunity to work
together toward a mutually beneficial integrated solution, have the authority
to approve or reject any changes in the project's scope, schedule, or budget,
provide oversight and direction to the project, and review and approve the
schedule baseline and all project documentation. The CIO shall ensure
that the project has in place adequate project management and oversight
structures for addressing major issues that could affect the project's scope,
schedule or budget and shall address issues that cannot be resolved by the
internal agency oversight committee.
B. Whenever a statewide or multiagency project has received
approval from the Secretary, the primary project oversight shall be conducted
by a committee composed of representatives from agencies impacted by the
project, which shall be established by the CIO.
B. Whenever the project charter has been approved for a major information technology project, an enterprise information technology project, or for an information technology project with high risk and high complexity, the Secretary shall establish a Secretariat Oversight Committee (SOC). Whenever the project charter has been approved for any other Commonwealth information technology project, the CIO shall establish an SOC. The SOC shall represent all business or functional stakeholders of the project including stakeholders in other secretariats, validate the proposed project business case, review and make recommendations on changes in the project’s scope, schedule or budget, and review Independent Verification and Validation reports and recommend corrective actions if needed.
§ 58.1-1840.1. Virginia Tax Amnesty Program established.
A. There is hereby established the Virginia Tax Amnesty Program. It is the intent of this program to improve voluntary compliance with the tax laws and to increase and to accelerate collections of certain taxes owed to the Commonwealth.
B. The Virginia Tax Amnesty Program shall be administered by the Department of Taxation, and any person, individual, corporation, estate, trust or partnership required to file a return or to pay any tax administered or collected by the Department of Taxation shall be eligible to participate, subject to the requirements set forth below and guidelines established by the Tax Commissioner.
C. The Tax Commissioner shall establish guidelines and rules for the procedures for participation and any other rules that are deemed necessary by the Tax Commissioner. The guidelines and rules issued by the Tax Commissioner regarding the Virginia Tax Amnesty Program shall be exempt from the Administrative Process Act (§ 2.2-4000 et seq.).
D. The Virginia Tax Amnesty Program shall have the following features:
1. The program shall be conducted during the period July 1, 2009, through June 30, 2010, and shall not last less than 60 nor more than 75 days. The exact dates of the program shall be established by the Tax Commissioner.
2. All civil or criminal penalties assessed or assessable, as provided in this title, including the addition to tax under §§ 58.1-492 and 58.1-504, and one-half of the interest assessed or assessable, as provided in this title, which are the result of nonpayment, underpayment, nonreporting or underreporting of tax liabilities, shall be waived upon receipt of the payment of the amount of taxes and interest owed, with the following exceptions:
a. No person, individual, corporation, estate, trust or partnership currently under investigation or prosecution for filing a fraudulent return or failing to file a return with the intent to evade tax shall qualify to participate.
b. No person, individual, corporation, estate, trust or partnership shall be eligible to participate in the program with respect to any assessment outstanding for which the date of assessment is less than 90 days prior to the first day of the program or with respect to any liability arising from the failure to file a return for which the due date of the return is less than 90 days prior to the first day of the program.
c. No person, individual, corporation, estate, or trust shall be eligible to participate in the program with respect to any tax liability from the income taxes imposed by §§ 58.1-320, 58.1-360 and 58.1-400, if the tax liability is attributable to taxable years beginning on and after January 1, 2008.
E. For the purpose of computing the outstanding balance due because of the nonpayment, underpayment, nonreporting or underreporting of any tax liability that has not been assessed prior to the first day of the program, the rate of interest specified for omitted taxes and assessments under § 58.1-15 shall not be applicable. The Tax Commissioner shall, instead, establish one interest rate to be used for each taxable year that approximates the average "underpayment rate" specified under § 58.1-15 for the five-year period immediately preceding the program.
F. 1. If any taxpayer eligible for amnesty under this section and under the rules and guidelines established by the Tax Commissioner retains any outstanding balance after the close of the Virginia Tax Amnesty Program because of the nonpayment, underpayment, nonreporting or underreporting of any tax liability eligible for relief under the Virginia Tax Amnesty Program, then such balance shall be subject to a 20 percent penalty on the unpaid tax. This penalty is in addition to all other penalties that may apply to the taxpayer.
2. Any taxpayer who defaults upon any agreement to pay tax and interest arising out of a grant of amnesty is subject to reinstatement of the penalty and interest forgiven and the imposition of the penalty under this section as though the taxpayer retained the original outstanding balance at the close of the Virginia Tax Amnesty Program.
G. For the purpose of implementing the Virginia Tax Amnesty
Program, the Department is exempt from §§ 2.2-2015 and 2.2-2018
2.2-2018.1 through 2.2-2021 pertaining to the Virginia Information Technologies
Agency's project management and procurement oversight.
2. That §§ 2.2-2018 and 2.2-2019 of the Code of Virginia are repealed.
3. That the provisions of this Act shall not apply to a public institution of higher education that has a valid (i) management agreement with the Commonwealth pursuant to subsection D of § 23-38.88 or (ii) a memorandum of understanding with the Secretary of Technology pursuant to § 23-38.90.