SEARCH SITE

VIRGINIA LAW PORTAL

SEARCHABLE DATABASES

ACROSS SESSIONS

Developed and maintained by the Division of Legislative Automated Systems.

2010 SESSION

  • | print version

SB 395 Stormwater management regulations; changes effective date that establishes local program criteria.

Introduced by: Frank W. Wagner | all patrons    ...    notes | add to my profiles | history

SUMMARY AS PASSED:

Stormwater management regulations; effective date. Delays the regulation that establishes local program criteria and delegation procedures and the water quality and water quantity criteria. The regulation, however, shall be adopted within 280 days after the establishment of the U.S. Environmental Protection Agency's Chesapeake Bay-wide Total Maximum Daily Load, but no later than December 1, 2011. The bill also directs the Virginia Soil and Water Conservation Board to establish an advisory panel to review the regulation and make recommendations on possible revisions to the regulation. This bill incorporates SB 677, SB 245, and SB 681. This bill is identical to HB 1220.

SUMMARY AS PASSED SENATE:

Stormwater management regulations; effective date. Delays the regulation that establishes local program criteria and delegation procedures and the water quality and water quantity criteria. The regulation, however, shall be adopted within 280 days after the establishment of the U.S. Environmental Protection Agency's Chesapeake Bay-wide Total Maximum Daily Load, but no later than December 1, 2011. This bill incorporates SB 677, SB 245, and SB 681. This bill is identical to HB 1220.

SUMMARY AS INTRODUCED:

Stormwater management regulations; effective date. Extends the effective date of the regulation that establishes local program criteria and delegation procedures and the water quality and water quantity criteria based on the completion of the Virginia Total Maximum Daily Loads (TMDL) Implementation Plan for the Chesapeake Bay Nutrient and Sediment TMDL approved by the United States Environmental Protection Agency and the regulations thereafter adopted to implement the Plan.