HB 205 Small renewable energy projects; permit by rule process.

Introduced by: Ronnie R. Campbell | all patrons    ...    notes | add to my profiles

SUMMARY AS INTRODUCED:

Small renewable energy projects; permit by rule process. Provides that any proposed wind energy project with a project boundary located less than two miles from a jurisdictional boundary is not qualified for a permit by rule from the Department of Environmental Quality. The measure also (i) requires the engineering certification for a wind energy project to state the amount of energy projected to be generated by the facility, on an annual average basis, based on wind studies conducted at the proposed project site for a minimum of two years; (ii) requires the Department to hold a public hearing; (iii) limits eligibility for wind-powered generation facilities to make use of the permit by rule process to those that have a rated capacity not exceeding 100 megawatts and disturb fewer than 50 acres in the complete construction of the project including access roads; and (iv) reduces the maximum capacity for facilities that generate electricity only from sunlight from 150 megawatts to 100 megawatts.


FULL TEXT

HISTORY