AMENDMENT(S) PROPOSED BY THE HOUSE

DEL. SULLIVAN

    1. Line 159, substitute, after in

      strike

        2050

      insert

        2045

DEL. SULLIVAN

    2. Line 159, substitute, after beyond

      strike

        2050

      insert

        2045

DEL. SULLIVAN

    3. Line 254, substitute, after color

      strike

        and

      insert

        or

DEL. SULLIVAN

    4. Line 254, substitute, after (ii)

      strike

        is

DEL. SULLIVAN

    5. Line 566, substitute, after (ii)

      strike

        is

DEL. SULLIVAN

    6. Line 566, substitute, after determine

      strike

        whter

      insert

        whether

DEL. SULLIVAN

    7. Line 717, substitute, after color

      strike

        and

      insert

        or

DEL. SULLIVAN

    8. Line 717, substitute, after (ii)

      strike

        is

DEL. SULLIVAN

    9. Line 731, substitute, after a

      strike

        disporportionate

      insert

        disproportionate

DEL. SULLIVAN

    10. Line 733, substitute, after of

      strike

        carbon.y

      insert

        carbon.

DEL. SULLIVAN

    11. Line 1245, substitute, after color

      strike

        and

      insert

        or

DEL. SULLIVAN

    12. At the beginning of line 1267, substitute

      strike

        non-silivicultural

      insert

        non-silvicultural

DEL. SULLIVAN

    13. Line 1280, substitute, after 1.

      insert

        By December 31, 2024, except for any coal-fired electric generating units (i) jointly owned with a cooperative utility or (ii) owned and operated by a Phase II utility located in the coalfield region of the Commonwealth that co-fires with biomass, any Phase I and Phase II Utility shall retire all generating units principally fueled by oil with a rated capacity in excess of 500 megawatts and all coal-fired electric generating units operating in the Commonwealth.

        2.

DEL. SULLIVAN

    14. At the beginning of line 1282, substitute

      strike

        2.

      insert

        3. By December 31, 2030, any Phase II Utility shall retire any coal-fired electric generating units located in the coalfield region of the Commonwealth that co-fires with biomass, unless such facility can demonstrate at least 83 percent reduction in carbon emissions through capture and sequestration.

        4.

DEL. SULLIVAN

    15. Line 1282, substitute, after 31,

      strike

        2050

      insert

        2045

DEL. SULLIVAN

    16. At the beginning of line 1284, substitute

      strike

        3.

      insert

        5.

DEL. SULLIVAN

    17. Line 1289, substitute, after retail

      strike

        suppler

      insert

        supplier

DEL. SULLIVAN

    18. Line 1294, substitute, after may

      strike

        uses

      insert

        use RECs from any renewable energy facility, as defined in § 56-576. However, at no time during this period or thereafter may any retail supplier use

DEL. SULLIVAN

    19. Line 1324, substitute, after in the

      strike

        the remainder of line 1324

DEL. SULLIVAN

    20. Line 1328, substitute

      strike

        Utiltity

      insert

        Utility

DEL. SULLIVAN

    21. Line 1367, substitute, after retail

      strike

        suppler

      insert

        supplier

DEL. SULLIVAN

    22. Line 1375, substitute, after retail

      strike

        suppler

      insert

        supplier

DEL. SULLIVAN

    23. Line 1533, substitute, after 9.1

      strike

        of Title 56

      insert

DEL. SULLIVAN

    24. Line 1537, substitute, after §

      strike

      insert

         

DEL. SULLIVAN

    25. Line 1775, substitute, after least

      strike

        1.00

      insert

        2.00

DEL. SULLIVAN

    26. Line 1784, substitute, after least

      strike

        2.5

      insert

        5.0

DEL. SULLIVAN

    27. Line 1928, substitute, after 50

      strike

        500

      insert

        1000

DEL. SULLIVAN

    28. Line 1997, substitute, after of

      insert

        local workers,

DEL. SULLIVAN

    29. Line 2012, substitute, after of

      insert

        the RPS Program and

DEL. SULLIVAN

    30. Line 2013, substitute

      insert

        13. That by January 1, 2028, if the Secretary of Natural Resources and the Secretary of Commerce and Trade determine that the greenhouse gas reduction targets are not met pursuant to § 10.1-1330, then there shall be a moratorium on the issuance of permits for new fossil fuel fired generating facilities by January 1, 2030.