HOUSE BILL NO. 1891
Offered January 14, 2015
Prefiled January 13, 2015
A BILL to amend and reenact Chapters 309 and 404 of the Acts of Assembly of 2013, relating to a six-year capital outlay plan for projects to be funded entirely or partially from general fund-supported resources.
----------
Patron-- Jones
----------
Referred to Committee on Appropriations
----------

Be it enacted by the General Assembly of Virginia:

1. That Chapters 309 and 404 of the Acts of Assembly of 2013 are amended and reenacted as follows:

§ 1. That the The following capital outlay projects and descriptive information shall constitute the Commonwealth's capital outlay plan, pursuant to § 2.2-1518 of the Code of Virginia, for the capital projects supported entirely or partially from the general fund for the six-year period beginning July 1, 2013 2015. The terms "construction" as defined in § 2.2-1515 of the Code of Virginia and "planning only," which encompasses the terms "pre-planning" and "detailed planning" as defined in § 2.2-1515 of the Code of Virginia, in the "Funding Phase/Comment" column denote the funding phase to which each project has been authorized to proceed. All projects authorized for the "construction" phase are considered top priority and have not been assigned a numerical priority ranking.

Agency Code/Agency

Priority

Project Name

Category

Funding Phase/ Comment

123--Department of Military Affairs

 

 

Renovate Waller Depot Complex

$0 to $10,000,000

Construction

146--The Science Museum of Virginia

 

 

 

 

 

Construct Event Space and Upgrade Museum Exhibits

$10,000,001 to $25,000,000

Construction

 

2

Construct Discovery Park

$0 to $10,000,000

 

156--Department of State Police

 

 

 

 

 

1

Construct State Police Castlewood BCI Office

$0 to $10,000,000

Construction

 

Improve and Expand Area Offices

$0 to $10,000,000

Construction

 

Rehabilitate or replace South Hill and Emporia Area Offices

$0 to $10,000,000

Construction

194--Department of General Services

 

 

 

 

 

Renovate 9th Street Office Building and Construct Parking Deck

$75,000,001 to $100,000,000 $50,000,001 to $75,000,000

Construction

 

 

Make Critical Repairs and Improvements to Consolidated Lab

$10,000,001 to $25,000,000

Construction

 

 

Replace Roof on DGS Westmoreland Plaza Building

$0 to $10,000,000

Construction

 

1

Renovate Supreme Court Interior Building

Above $100,000,000

Planning only

 

Capitol Complex Infrastructure and Security Improvements

Above $100,000,000

Construction - On Hold

 

4

Renovate Old City Hall

$25,000,001 to $50,000,000

Included in "Capitol Complex Infrastructure and Security"

 

5 2

Renovate Morson Row

$0 to $10,000,000

Planning only

 

6 3

Demolish Zincke, Ferguson, and Aluminum Buildings

$0 to $10,000,000

Funding not yet authorized

 

Capital Projects Space Improvement for Dept. of Conservation and Recreation

$0 to $10,000,000

Construction

 

Repair Exterior of Monroe Building and Replace Jefferson Building Windows

$0 to $10,000,000

Construction

199--Department of Conservation & Recreation

 

 

 

 

 

Construct Phase I Development and Campground, Widewater State Park

$10,000,001 to $25,000,000 $0 to $10,000,000

Construction

 

Complete Cabin Complexes, Multiple State Parks Construct New Cabins, Various State Parks

$10,000,001 to $25,000,000 $0 to $10,000,000

Construction

 

Complete Phase I Development, Powhatan State Park

$0 to $10,000,000

Construction

 

 

Construct Highway Intersection, Powhatan State Park

$0 to $10,000,000

Construction

 

1

Renovate Historic Buildings, Walnut Valley Farm, Chippokes Plantation State Park

$0 to $10,000,000

Planning only

 

4 2

Construct On-Site Residences, Various State Parks

$0 to $10,000,000

Funding not yet authorized

 

5 3

Improve Natural Areas Access

$0 to $10,000,000

Funding not yet authorized

 

6 4

Construct Visitor Centers at Douthat, Kiptopeke, & High Bridge State Parks

$0 to $10,000,000

Funding not yet authorized

 

7 5

Construct Improvements at Natural Areas

$0 to $10,000,000

Funding not yet authorized

 

8 6

Construct Visitor Centers at Twin Lakes, Sky Meadows, and Fairy Stone State Parks

$0 to $10,000,000

Funding not yet authorized

 

9 7

Construct Visitor Center/Environmental Education Center, Five State Parks

$10,000,001 to $25,000,000

Funding not yet authorized

 

10 8

Develop Infrastructure, New River Trail State Park

$10,000,001 to $25,000,000

Funding not yet authorized

 

11 9

Dredge Boat Ramp and Repair Shoreline Erosion, Belle Isle State Park

$0 to $10,000,000

Funding not yet authorized

 

12 10

Acquire property for Mayo River State Park

$0 to $10,000,000

Funding not yet authorized

 

Repair and Upgrade State Parks Owned Dams

$0 to $10,000,000

Construction

202--Virginia State Library

 

 

 

 

 

 

Improve Library Storage, Security, and IT

$0 to $10,000,000

Construction

203--Woodrow Wilson Rehabilitation Center

 

 

 

 

 

1

Renovate Anderson Vocational Building, Phase I

$0 to $10,000,000

Construction

 

2

Renovate Dining Hall and Activities Building, Phase II

$0 to $10,000,000

Construction

 

3

Roof Replacement, Birdsall-Hoover Medical Administration Building

$0 to $10,000,000

Construction

 

4

Asbestos Abatement, Phase 4

$0 to $10,000,000

Construction

 

5

Implement ADA Compliance Measures Campuswide

$0 to $10,000,000

Construction

 

1

Renovate Anderson Vocational Building, Phase II

$10,000,001 to $25,000,000

Planning only

204--The College of William and Mary

 

 

 

 

 

1

Construct Integrated Science Center, Phase III

$75,000,001 to $100,000,000

Construction

 

2

Renovate Tucker Hall

$10,000,001 to $25,000,000

Completed

 

3

Renovate Tyler Hall

$10,000,001 to $25,000,000

Construction

 

4

Construct Cooling Plant and Replace Utilities, Phase IV

$0 to $10,000,000

Construction

 

5

Renovate the Brafferton and Brafferton Kitchen

$0 to $10,000,000

Completed

 

61

Fine Arts Facility Phase I

$0 to $10,000,000

 Funding not

yet authorized

 

7

Improve Lake Matoaka Dam Spillway

$0 to $10,000,000

Construction

 

8

Improve Campus Stormwater Infrastructure

$0 to $10,000,000

Construction

 

9

Improve Accessibility Infrastructure

$0 to $10,000,000

Construction

207--University of Virginia

 

 

 

 

 

1

Renovate New Cabell Hall

$50,000,001 to $75,000,000

Construction

 

2

Renovate Ruffner Hall

$10,000,001 to $25,000,000

Completed

 

3

Renovate the Rotunda

$25,000,001 to $50,000,000

Construction

 

4

Construct Ivy Foundation Translational Research Building

$50,000,001 to $75,000,000

 

 

5

Replace North Grounds Boiler and Chiller Plant

$10,000,001 to $25,000,000

 

 

6

Renovate Rugby Administrative Building

$10,000,001 to $25,000,000

 

 

 

Renovate Research Labs

$0 to $10,000,000

Construction

 

1

Renovate Gilmer Hall and Chemistry Building

Above $100,000,000

Planning only

208--Virginia Polytechnic Institute and State University

 

 

 

 

 

1

Address Fire Alarm Systems and Access

$0 to $10,000,000

Construction

 

2

Renovate Davidson Hall

$25,000,001 to $50,000,000

Completed

 

3

Construct Engineering Signature Building

$75,000,001 to $100,000,000

Completed

 

4

Construct Chiller Plant, Phase I

$10,000,001 to $25,000,000

Construction

 

5

Construct Classroom Building

$25,000,001 to $50,000,000

Construction

 

6 1

Renovate/Renew Academic Buildings

$10,000,001 to $25,000,000

Planning only

 

7 2

Construct Undergraduate Science Building

$25,000,001 to $50,000,000

Funding not yet authorized

 

8 3

Construct Translational Medicine Laboratory

$50,000,001 to $75,000,000

Funding not yet authorized

 

9 4

Construct Chiller Plant, Phase II

$10,000,001 to $25,000,000

Funding not yet authorized

 

10 5

Renovate Military Sciences Building

$10,000,001 to $25,000,000

Funding not yet authorized

 

11 6

Construct Library Collections Facility

$0 to $10,000,000

Funding not yet authorized

209--University of Virginia Medical Center

 

 

 

 

 

1

Renovate and Equip Medical Center Facilities

$25,000,001 to $50,000,000

 

211--Virginia Military Institute

 

 

 

 

 

1

Renovate Science Building

$10,000,001 to $25,000,000

Completed

 

2

Renovate Post Hospital

$0 to $10,000,000

Completed

 

3

Construct Corps Physical Training Facilities - Phase I

$75,000,001 to $100,000,000 Above $100,000,000

Construction

 

4

Construct Corps Physical Training Facilities - Phase II

$25,000,001 to $50,000,000

Merged with Phase I

 

5

Improve Admissions and Financial Aid Offices

$0 to $10,000,000

 

 

6 1

Improve Post Infrastructure, Phase I

$10,000,001 to $25,000,000

Funding not yet authorized

 

7 2

Renovate Moody Hall

$10,000,001 to $25,000,000

Funding not yet authorized

 

8 3

Improve Historic Preservation Sites, Phase I

$0 to $10,000,000

Funding not yet authorized

 

9

Improve Public Safety and Security on Post, Phase I

$0 to $10,000,000

 

212--Virginia State University

 

 

 

 

 

1

Construct a Multipurpose Center

$75,000,001 to $100,000,000

Construction

 

2

Renovate Lockett Hall

$10,000,001 to $25,000,000

Construction

 

3

Construct Water Storage Tank and Campus Water Distribution Piping

$0 to $10,000,000

Construction

 

4

Erosion and Sediment Control Stormwater Master Plan/Retention Pond

$0 to $10,000,000

Construction

 

5 1

Renovate and Expand Daniel Gym

$25,000,001 to $50,000,000

Funding not yet authorized

213--Norfolk State University

 

 

 

 

 

1

Construct a New Nursing and General Classroom Building

$25,000,001 to $50,000,000

Construction

 

2

Renovate the Wilder Center

$0 to $10,000,000

Completed

 

3

Replace Brown Hall

$50,000,001 to $75,000,000

Construction

 

4 2

Renovate and Expand the Hamm Fine Arts Building

$25,000,001 to $50,000,000

Funding not yet authorized

 

5 3

Improve Signage, Roads and Campus Boundary, Phase I

$0 to $10,000,000

Funding not yet authorized

 

6 1

Construct Science Building

$10,000,001 to $25,000,000 $50,000,001 to $75,000,000

Funding not yet authorized

214--Longwood University

 

 

 

 

 

1 2

Construct New Academic Building

$10,000,001 to $25,000,000

Planning only

 

2

Renovate French Hall for Relocated Technology Center

$10,000,001 to $25,000,000

Same as University Technology Center (completed)

 

3

Install New Biomass Boiler

$0 to $10,000,000

Construction

 

4

Replace Willett Hall HVAC

$0 to $10,000,000

Construction

 

5

Construct Student Success Center

$0 to $10,000,000

Construction

 

6 3

Construct Physical Plant Building

$25,000,001 to $50,000,000

Funding not yet authorized

 

7 4

Renovate Heating Plant Facility

$10,000,001 to $25,000,000

Funding not yet authorized

 

8 5

Renovate Wygal Hall

$0 to $10,000,000

Funding not yet authorized

 

9 1

Construct New Admissions Office

$0 to $10,000,000

Planning only

215--University of Mary Washington

 

 

 

 

 

1

Renovate Mercer and Woodward Halls

$0 to $10,000,000 $10,000,001 to $25,000,000

Construction

 

2 1

Construct Jepson Science Center Addition

$10,000,001 to $25,000,000

Planning only

 

3 2

Repair/Replace Underground Utilities

$0 to $10,000,000

Funding not yet authorized

 

4

Improve Storm Water Management

$0 to $10,000,000

Construction

 

5 3

Install University Card Access System

$0 to $10,000,000

Funding not yet authorized

 

6

Construct Information and Technology Convergence Center

$25,000,001 to $50,000,000

Completed

216--James Madison University

 

 

 

 

 

1

Renovate West Wing Rockingham Hospital

$50,000,001 to $75,000,000

Construction

 

2

Renovate and Expand Duke Hall

$25,000,001 to $50,000,000

Completed

 

3

Construct Health and Engineering Academic Facility

$50,000,001 to $75,000,000

Construction

 

4 3

Renovate Moody Hall

$10,000,001 to $25,000,000

Funding not yet authorized

 

1

Renovate/Addition Madison Hall

$25,000,001 to $50,000,000

Planning only

 

5 2

Renovate Johnston Hall

$0 to $10,000,000

Funding not yet authorized

 

6

Construct Technology Infrastructure-Phases 1 & 2

$0 to $10,000,000

 

 

7

Replace Boiler and Infrastructure - Phase 2

$0 to $10,000,000

Construction

 

8

Repair Newman Lake Dam

$0 to $10,000,000

Construction

217--Radford University

 

 

 

 

 

1

Construct New Computational Sciences Building

$25,000,001 to $50,000,000

Construction

 

2

Construct New Academic Building, Phases I and II

$50,000,001 to $75,000,000

Construction

 

3 2

Renovate Curie Hall

$25,000,001 to $50,000,000

Funding not yet authorized

 

4 1

Renovate Whitt Hall

$0 to $10,000,000

Planning only

218--Virginia School for the Deaf and the Blind

 

 

 

 

 

1

Renovate Main Hall

$10,000,001 to $25,000,000

Planning only

 

2

Repair Chapel

$0 to $10,000,000

Funding not yet authorized

 

3

Renovate Bradford Hall

$0 to $10,000,000

Funding not yet authorized

 

4

Increase Campus Security, ADA and Other Regulatory Compliance

$0 to $10,000,000

Construction

 

5

Install Sprinklers in Byrd Hall

$0 to $10,000,000

Construction

221--Old Dominion University

 

 

 

 

 

1

Construct New School of Education

$25,000,001 to $50,000,000

Construction

 

2

Construct a Systems Research and Academic Building

$10,000,001 to $25,000,000

Completed

 

3

Replace Mechanical Systems in Oceanography and Physics Building

$0 to $10,000,000

Construction

 

4

Construct Joint Policing Facility

$10,000,001 to $25,000,000

 

 

5

Renovate Spong and Rollins Halls

$25,000,001 to $50,000,000

 

 

1

Construct Chemistry Building

$50,000,001 to $75,000,000

Planning only

 

6 2

Construct a New Facilities Support Building

$25,000,001 to $50,000,000

Funding not yet authorized

 

7

Renovate the Education Building

$10,000,001 to $25,000,000

 

229--Virginia Cooperative Extension and Agriculture Experiment Station

 

 

 

 

 

1

Construct Human & Agricultural Biosciences Building I

$50,000,001 to $75,000,000

Construction

 

2 1

Improve Kentland Facilities, Phase I

$10,000,001 to $25,000,000

Planning only

 

3 2

Construct Animal Production Facility

$0 to $10,000,000

Funding not yet authorized

 

4 3

Construct Human and Agricultural Bioscience Facility, Phase II

$75,000,001 to $100,000,000

Funding not yet authorized

236--Virginia Commonwealth University

 

 

 

 

 

1

Construct Classroom Building

$50,000,001 to $75,000,000

Completed

 

2 1

Renovate Sanger Hall, Phase II

$25,000,001 to $50,000,000

Planning only

 

3

Construct Information Commons and Renovate Libraries

$50,000,001 to $75,000,000

Construction

 

 

Replace the Virginia Treatment Center for Children

$50,000,001 to $75,000,000

Construction

 

4

Renovate Student Services Building, MCV Campus

$0 to $10,000,000

 

 

5 3

Renovate East Wing of the Oliver Hall Building

$0 to $10,000,000

Funding not yet authorized

 

6 2

Renovate Raleigh Building

$0 to $10,000,000

Planning only

238--Virginia Museum of Fine Arts

 

 

 

 

 

1

Renovate Robinson House

$0 to $10,000,000

Construction

 

2

Replace Roof, 1985 Addition

$0 to $10,000,000

Construction

 

 

Renovate and Expand Feberge Gallery

$0 to $10,000,000

Construction

239--Frontier Culture Museum of Virginia

 

 

 

 

 

1

Construct Early American Industry Exhibit

$0 to $10,000,000

Planning only

 

2

Expand Infrastructure

$0 to $10,000,000

Funding not yet authorized

241--Richard Bland College

 

 

 

 

 

1

Renovate Ernst Hall

$0 to $10,000,000

Construction

 

2

Umbrella Maintenance Project

$0 to $10,000,000

Construction

 

3

Construct Police Department/Technology Services Building

$0 to $10,000,000

 

242--Christopher Newport University

 

 

 

 

 

1

Construct Student Success Center

$25,000,001 to $50,000,000

Construction

 

2

Construct Integrated Science Center, Phases I and II

$75,000,001 to $100,000,000

Completed

 

3

Construct Luter School of Business

$50,000,001 to $75,000,000

Completed

 

4 1

Construct Renovate and Expand Library, Phase II

$25,000,001 to $50,000,000

Planning only

 

2

Construct and Renovate Fine Arts and Rehearsal Space

$0 to $10,000,000

Planning only

 

5

Improve Student Security Infrastructure

$0 to $10,000,000

 

246--UVA's College at Wise

 

 

 

 

 

1

Construct New Library

$25,000,001 to $50,000,000

Construction

 

2

Dam Safety Modifications

$0 to $10,000,000

Construction

 

3 1

Renovate/Convert Wyllie Library

$10,000,001 to $25,000,000

Funding not yet authorized

 

4 2

Construct Proscenium Theatre Building

$25,000,001 to $50,000,000

Funding not yet authorized

247--George Mason University

 

 

 

 

 

1

Renovate Fine Arts Building

$0 to $10,000,000

Completed

 

2

Construct Satellite Cooling and Heating Plant

$10,000,001 to $25,000,000

Funding not yet authorized

 

3

Expand Central Utility Plant, Fairfax

$0 to $10,000,000

Construction

 

4

Construct Campus Library addition, Phase I

$50,000,001 to $75,000,000

Construction

 

5

Construct Potomac Science Center

$25,000,001 to $50,000,000

Construction

 

6

Construct Academic VII/Research III, Phase I

$50,000,001 to $75,000,000

Construction

 

7

Construct Life Sciences Building, Prince William Campus

$25,000,001 to $50,000,000

Construction

 

8

Expand Hylton Center

$0 to $10,000,000

Construction

 

9 1

Renovate Robinson Hall and Harris Theater

$50,000,001 to $75,000,000

Funding not yet authorized

 

10 4

Construct Facilities Complex, Fairfax Campus

$25,000,001 to $50,000,000

Funding not yet authorized

 

11 3

Improve Telecommunications Infrastructure

$0 to $10,000,000

Funding not yet authorized

260--Virginia Community College System

 

 

 

 

 

1

Construct Replacement for Tyler Academic Building, Northern Virginia - Alexandria Campus

$25,000,001 to $50,000,000

Construction

 

2

Renovate and Expand Brault Building, Northern Virginia - Annandale Campus

$10,000,001 to $25,000,000

Construction

 

3

Construct Learning Resources Building, Southside Virginia

$10,000,001 to $25,000,000

Completed

 

4

Construct Workforce Training Center, Northern Virginia - Woodbridge Campus

$10,000,001 to $25,000,000

Construction

 

5

Construct New Classroom and Administration Building, Blue Ridge

$10,000,001 to $25,000,000

Construction

 

6

Construct Phase III Academic Building, Midlothian Campus, John Tyler CC

$25,000,001 to $50,000,000

Construction

 

7

Renovate Bayside Building, Virginia Beach Campus, Tidewater CC

$10,000,001 to $25,000,000

Construction

 

8

Renovate Building B, J. Sargeant Reynolds - Parham Road Campus,

$10,000,001 to $25,000,000

Construction

 

9

Renovate Reynolds Academic Building, Loudoun Campus, Northern Virginia CC

$10,000,001 to $25,000,000

Construction

 

10

Renovate Main Building, Lord Fairfax

$0 to $10,000,000

Construction

 

11

Renovate Replace Anderson Hall, Virginia Western

$10,000,001 to $25,000,000 $25,000,001 to $50,000,000

Construction

 

12

Expand Workforce Development Center, Danville

$0 to $10,000,000

Construction

 

13 1

Renovate Phase I Replace Academic and Administration Building, Eastern Shore

$0 to $10,000,000 $10,000,001 to $25,000,000

Planning only

 

14

Construct Bioscience Building, Blue Ridge CC

$10,000,001 to $25,000,000

Construction

 

15 2

Construct Phase VII Academic Building, Annandale Campus, Northern Virginia CC

$25,000,001 to $50,000,000

Planning only

 

16 3

Renovate Engineering and Industrial Technology Building, Danville CC

$10,000,001 to $25,000,000

Planning only

 

17

Construct Academic Building CN6, Chesapeake Campus, Tidewater CC

$25,000,001 to $50,000,000

Construction

 

 

Renovate Sowder Hall, Fauquier Campus, Lord Fairfax

$0 to $10,000,000

Construction

 

5

Renovate Godwin Building, Annandale Campus, Northern Virginia

$25,000,001 to $50,000,000

Planning only

 

6

Construct Academic Building, Fauquier Campus, Lord Fairfax

$10,000,001 to $25,000,000

Planning only

 

7

Renovate Seefeldt Building, Woodbridge Campus, Northern Virginia

$25,000l,001 to $50,000,000

Planning only

 

8

Renovate Howsmom Building, Manassas Campus, Northern Virginia

$25,000,001 to $50,000,000

Planning only

 

18 4

Construct Student Service & Learning Resources Center, Christanna Campus, Southside Virginia

$10,000,001 to $25,000,000

Planning only

 

19 9

Construct New Building for Trucking Program, Tidewater - Portsmouth Campus

$10,000,001 to $25,000,000

Funding not yet authorized

 

20 10

Improve Heating, Ventilation, and Air Conditioning, Rappahannock

$0 to $10,000,000

Funding not yet authorized

 

21 11

Construct Science Building, Chester Campus, John Tyler CC

$10,000,001 to $25,000,000

Funding not yet authorized 

 

22 12

Construct Academic Building, Middletown Campus, Lord Fairfax CC

$10,000,001 to $25,000,000

Funding not yet authorized

 

23 13

Construct Academic Health and Wellness Center, Hampton Campus, Thomas Nelson CC

$10,000,001 to $25,000,000

Funding not yet authorized

 

24 14

Renovate Library and Learning Resource Center, Virginia Highlands

$0 to $10,000,000

Funding not yet authorized

 

25 15

Construct Workforce Development Center, Piedmont Virginia

$0 to $10,000,000

Funding not yet authorized

 

26 16

Renovate Buildings: Carroll, Bland, Galax, Grayson, Fincastle, and Smyth Halls, Wytheville

$25,000,001 to $50,000,000

Funding not yet authorized

 

27 17

Replace Exterior Windows and Doors, Rappahannock

$0 to $10,000,000

Funding not yet authorized

 

28 18

Renovate Bird and Nicholas Halls, John Tyler - Chester Campus

$25,000,001 to $50,000,000

Funding not yet authorized

 

29 19

Construct Learning Resources Center, Tidewater - Chesapeake Campus

$25,000,001 to $50,000,000

Funding not yet authorized

 

30 20

Renovate Plaza, Structural Repairs Phase II, Annandale Campus, Northern Virginia

$0 to $10,000,000

Funding not yet authorized

 

31 21

Construct Network Operations Center, Tidewater

$0 to $10,000,000

Funding not yet authorized

 

32 22

Expand and Renovate Phase III Academic Building, Northern Virginia - Loudoun Campus

$10,000,001 to $25,000,000

Funding not yet authorized

 

33 23

Renovate Bisdorf Phase II Academic Building, Northern Virginia - Alexandria

$10,000,001 to $25,000,000

Funding not yet authorized

 

34 24

Construct Workforce Solutions and Academic Training Center, Fauquier Campus, Lord Fairfax

$10,000,001 to $25,000,000

Funding not yet authorized

35

Construct Canopies, Virginia Highlands

$0 to $10,000,000

 

36 25

Renovate Stone Hall Building, Patrick Henry

$0 to $10,000,000

Funding not yet authorized

 

37

Renovate Academic Classrooms and Administrative Building, Rappahannock

$10,000,001 to $25,000,000

Completed

 

38 26

Construct Phase III Academic Building, Woodbridge Campus, Northern Virginia

$25,000,001 to $50,000,000

Funding not yet authorized

 

39

Relocate Observatory and Great Dismal Swamp Education Center, Tidewater - Chesapeake Campus

$0 to $10,000,000

 

 

40 27

Renovate Academic Classrooms and Laboratories, Tidewater

$0 to $10,000,000

Funding not yet authorized

 

41 28

Construct Addition to Learning Resource Center, Patrick Henry

$0 to $10,000,000

Funding not yet authorized

 

42

Renovate and Repair Exterior/Interior Structures, Thomas Nelson

$0 to $10,000,000

 

 

43 29

Construct Maintenance Building, Germanna

$0 to $10,000,000

Funding not yet authorized

 

44 30

Renovate and Expand Phase III Academic Building, Manassas Campus, Northern Virginia

$25,000,001 to $50,000,000

Funding not yet authorized

268--Virginia Institute of Marine Sciences

 

 

 

 

 

1

Purchase Research Vessel

$0 to $10,000,000 $10,000,001 to $25,000,000

Construction

 

2

Construct a Consolidated Scientific Research Facility

$10,000,001 to $25,000,000

Construction

 

3 1

Construct Facilities Management Maintenance Facility

$0 to $10,000,000

Planning only

 

4 2

Replace the Oyster Hatchery

$10,000,001 to $25,000,000

Funding not yet authorized

 

5 3

Expand the Fisheries Science Building

$0 to $10,000,000

Funding not yet authorized

310--Virginia Economic Development Partnership

 

 

 

 

 

 

Construct Advanced Manufacturing Apprentice Center and Regional Centers of Excellence

$10,000,001 to $25,000,000

Construction

 

1

Bioscience Wet Laboratory Facility

$10,000,001 to $25,000,000

Funding not yet authorized

411--Department of Forestry

 

 

 

 

 

 

Construct Garages for Fire Dozers and Transports

$0 to $10,000,000

Construction

417--Gunston Hall

 

 

 

 

 

 

Renovate the Ann Mason Visitor Center and Adjacent Buildings

$0 to $10,000,000

Construction

425--Jamestown-Yorktown Foundation

 

 

 

 

 

1

Construct Yorktown Museum

$25,000,001 to $50,000,000

Construction

 

2

Develop Outdoor Interpretive Areas

$0 to $10,000,000

Construction

 

3

Yorktown Outside Areas, Signage and Amenities

$0 to $10,000,000

Construction

 

4

Construct Jamestown Road Wall and Sound Buffer

$0 to $10,000,000

Construction

702--Department for the Blind and Vision Impaired

 

 

 

 

 

1

Replace Roof on Library Resource Center

$0 to $10,000,000

Construction

 

1

Renovate the Departmental Headquarters Building

$0 to $10,000,000

Planning only

720--Department of Behavioral Health and Developmental Services

 

 

 

 

 

1

Replace Facility Roofs and Building Envelopes

$10,000,001 to $25,000,000

Construction

 

2 1

Construct New Sexually Violent Predator Facility

$50,000,001 to $75,000,000 Above $100,000,000

Planning only

 

3

Repair/Replace Campus Infrastructures

$0 to $10,000,000

Funding not yet authorized

 

4

Repair/Replace Boilers, Heat Distribution and HVAC Systems

$25,000,001 to $50,000,000

Funding not yet authorized

 

5 2

Replace Forensic Unit at Central State Hospital

$75,000,001 to $100,000,000 Above $100,000,000

Planning only

 

6 5

Replace Support Service Facility at Eastern State Hospital

$25,000,001 to $50,000,000

Funding not yet authorized

 

7

Abate Environmental Hazards

$0 to $10,000,000

Construction

777--Department of Juvenile Justice

 

 

 

 

 

1

Upgrade Reception and Diagnostic Center (Infirmary and School)

$10,000,001 to $25,000,000 $0 to $10,000,000

Funding not yet authorized

 

2

Renovate Cedar Lodge and Replace Modular Building

$0 to $10,000,000

 

 

3 2

Construct Building at Oak Ridge Juvenile Correctional Center

$10,000,001 to $25,000,000

Funding not yet authorized

 

4 3

Construct New Central Maintenance Building - Bon Air

$0 to $10,000,000

Funding not yet authorized

 

5 4

Construct New Central Maintenance and Materials Storage Building - Beaumont

$0 to $10,000,000

Funding not yet authorized

 

6 5

Convert Old Dining Hall to Dry Storage Warehouse Facility

$0 to $10,000,000

Funding not yet authorized

 

7 6

Construct Consolidated Central Warehouse Facility

$0 to $10,000,000

Funding not yet authorized

 

8 7

Renovate Beaumont Manor House

$0 to $10,000,000

Funding not yet authorized 

 

9

Renovate Historic Bon Air House

$0 to $10,000,000

 

 

10

Correct Erosion of Pamunkey River Bank

$0 to $10,000,000

Construction

778--Department of Forensic Science

 

 

 

 

 

1

Expand Central Forensic Laboratory & Office of Chief Medical Examiner Facility

$75,000,001 to $100,000,000 Above $100,000,000

Planning only

 

2

Expand Western Forensic Laboratory Facility and Office of the Chief Medical Examiner Facility

$25,000,001 to $50,000,000

Construction

 

3

Expand Eastern Forensic Laboratory Facility

$0 to $10,000,000

Construction

799--Department of Corrections

 

 

 

 

 

1

Construct Augusta Wastewater Treatment Plant

$0 to $10,000,000

Construction

 

2

Replace Windows and Mechanical Systems

$0 to $10,000,000

Completed

 

3

Replace Door Control Systems

$0 to $10,000,000

Construction

 

4

Replace Windows and Install Mechanical Equipment, VCCW Renovate Virginia Correctional Center for Women

$0 to $10,000,000 $10,000,001 to $25,000,000

Construction

 

5

Construct James River Water Line

$0 to $10,000,000

Construction

 

6

Replace Plumbing and Mechanical Systems - Baskerville

$0 to $10,000,000

Construction

 

7

Replace roofs - Keen Mountain

$0 to $10,000,000

Construction

 

8

Replace Roofs and HVAC - Lawrenceville

$0 to $10,000,000

Construction

 

9

Construct Acquire Office Building for Richmond Probation and Parole District Office

$0 to $10,000,000

Construction

 

10

Upgrade Fire Safety System

$0 to $10,000,000

Construction

 

 

Replace Fire Alarm Systems

$0 to $10,000,000

Construction

 

 

Replace James River Storage Tank on River Road

$0 to $$10,000,000

Construction

 

11 1

Upgrade Buckingham Wastewater Treatment Plant

$0 to $10,000,000

Planning only

 

2

Replace Generators at Multiple Facilities

$10,000,001 to $25,000,000

Planning only

 

12 5

Construct Re-Entry Program Buildings

$0 to $10,000,000

Funding not yet authorized

 

13 4

Replace Caroline Wastewater Treatment Plant

$0 to $10,000,000

Funding not yet authorized

 

14

Replace Security Panels and Enhance Security Controls and Surveillance Systems- Sussex I & II

$0 to $10,000,000

Construction

 

15

Replace Security Panels and Detention Systems Upgrade Operational and Security Systems - Keen Mountain

$0 to $10,000,000 $10,000,001 to $25,000,000

Construction

 

16 3

Upgrade Perimeter Detection System (Multiple Institutions)

$0 to $10,000,000

Funding not yet authorized

 

17

Upgrade Preliminary Wastewater Treatment

$0 to $10,000,000

Completed

 

18 6

Upgrade Building Electrical Service Entrance - Augusta

$0 to $10,000,000

Funding not yet authorized

 

19

Correct Environmental Deficiencies

$0 to $10,000,000

Construction

845--Dr. Martin Luther King, Jr. Memorial Commission

 

 

 

 

 

1

Emancipation and Freedom Monument

$0 to $10,000,000

Planning only

885--Institute for Advanced Learning Research

 

 

 

 

 

1

Construct Southern Virginia Bio-Renewable Center

$10,000,001 to $25,000,000

 

 

2

Construct Greenhouse

$0 to $10,000,000

 

912--Department of Veterans Services

 

 

 

 

 

1

Construct Veterans Care Center in Hampton Roads

$25,000,001 to $50,000,000

Construction

 

2

Construct Northern Virginia Care Center

$25,000,001 to $50,000,000

Construction

 

3

Construct Addition on the Sitter Barfoot Veterans Care Center

$0 to $10,000,000

Construction

 

4 1

Additions and Renovations, Veterans Care Center Salem

$0 to $10,000,000

Funding not yet authorized

 

5

Construct Expand Virginia Memorial/DVS Offices and Parking at Virginia War Memorial

$0 to $10,000,000 $10,000,001 to $25,000,000

 

935--Roanoke Higher Education Authority

 

 

 

 

 

1

Waterproof Building

$0 to $10,000,000

Construction

 

 

 Renovate and Expand

Claude Moore Building

$0 to $10,000,000

Construction

948--Southwest Virginia Higher Education Center

 

 

 

 

 

1

Construct Service Corridor and Storage Area

$0 to $10,000,000

Planning only

 

2

Construct New Academic Building

Above $100,000,000

 

 

3

Construct New Wing

$10,000,001 to $25,000,000

 

993--Central Capital Outlay

 

 

 

 

 

1

Improve Wallops Flight Facilities

$0 to $10,000,000

Completed