(SB1018)

AMENDMENT(S) REJECTED BY THE SENATE

SEN. MILLER J (WITHDRAWN)

    1. Line 105, introduced, at the beginning of the line

      strike

        all of lines 105 through 117

      insert

             The Authority shall phase construction of the transportation projects that are included in the federally mandated 2030 Regional Transportation Plan, or any successive plan. Except as specifically provided herein, projects listed in the second phase shall not be undertaken until the Authority has considered and acted upon a financing plan for the maintenance, operation, and construction for the projects listed in the first phase that meet the requirements of this section.

             First Phase Projects:

             Route 460 Upgrade; I-64 Widening on the Peninsula; I-64 Widening on the Southside; Downtown Tunnel/Midtown Tunnel/MLK Extension; Southeastern Parkway/Dominion Blvd/Route 17; I-664 Widening in Newport News; I-664 Widening on the Southside; I-664 Monitor Merrimac Memorial Bridge Tunnel Widening.

             Second Phase Projects:

             I-564 from I-64 to the Intermodal Connector; I-564 Connector to the Monitor Merrimac Memorial Bridge Tunnel; Craney Island Connector.